SENEVEN · Technical Services

Environmental Safety & Risk Assessment

Comprehensive environmental safety performance assessment for landfills, hazardous waste facilities and mine tailings.

Service Overview

Engineering Background

This assessment is performed per GB 18598-2019 "Standard for Pollution Control on the Hazardous Waste Landfill," Article 7.10. Landfills must periodically evaluate environmental safety performance based on leachate head level, generation rate, composition and concentration, leak-detection layer drainage, and groundwater monitoring results; remedial adjustments to operational plans and emergency measures are determined accordingly. Frequency: at least every two years during operation; at least every three years from closure to the end of design life; at least annually after the design life.

Environmental Safety & Risk Assessment
Key Features
  • Engineering and hydrogeological conditions analysis
  • Design and construction quality evaluation
  • Operating-procedure and management review
  • Containment-liner integrity inspection (incl. CCTV and tracer testing)
  • Heap and dam-body stability monitoring
  • Leachate management and treatment reliability assessment
  • Groundwater, surface water, soil and atmospheric impact evaluation
Technical Principle

Principle & Method

The assessment reviews historical construction records, operational logs and routine monitoring data, complemented by integrity inspection and heap-stability monitoring. Key aspects include: engineering and hydrogeological conditions; design and construction quality; operating procedures and actual management; containment-liner integrity; heap and dam-body stability; leachate management and treatment; and environmental monitoring and impacts. The output is a conclusive environmental safety performance assessment with concrete recommendations for operational management and pollution control.

Field Scenarios

Typical Scenarios & Diagrams

Assessment Frequency

GB 18598-2019 §7.10 requires landfills to assess environmental safety performance at intervals, on the basis of leachate level, generation rate, composition and concentration, leakage-detection-layer flow and groundwater monitoring results, and to decide from that assessment whether the operating plan needs revision and whether emergency measures are required.

StageInterval
During landfill operationAt least once every two years
Closure to end of design lifeAt least once every three years
After design lifeAt least once a year

Scope of Assessment

Aligned to GB 18598-2019 · GB 16889-2024 · CJJ/T 214-2016

  1. 01
    Geological and hydrogeological review
  2. 02
    Integrity and effectiveness of the barrier system
  3. 03
    Stability analysis of the waste mass and embankment
  4. 04
    Leachate generation, drainage and treatment systems
  5. 05
    Surrounding soil and groundwater monitoring data